dyanmark Posted 3 July 2019 Share Posted 3 July 2019 Are we seriously saying that the entire facility at Belvoir Drive was dug up first week of May and now 8/9 weeks later has been relaid and ready for use. Id be amazed.Im thinking 19 pitches at Seagrave were on the plans. Link to comment Share on other sites More sharing options...
davieG Posted 3 July 2019 Share Posted 3 July 2019 I guess it’s possible to start the pitches whilst the buildings are going up Link to comment Share on other sites More sharing options...
ramadaone Posted 3 July 2019 Share Posted 3 July 2019 On 2 July 2019 at 18:08, dyanmark said: There is no chance this will be in use this time next year=year after more likely .Need a growing season for the pitches when they are in . 14 minutes ago, dyanmark said: Are we seriously saying that the entire facility at Belvoir Drive was dug up first week of May and now 8/9 weeks later has been relaid and ready for use. Id be amazed.Im thinking 19 pitches at Seagrave were on the plans. Yes Link to comment Share on other sites More sharing options...
Fox in the North Posted 3 July 2019 Share Posted 3 July 2019 25 minutes ago, dyanmark said: Are we seriously saying that the entire facility at Belvoir Drive was dug up first week of May and now 8/9 weeks later has been relaid and ready for use. Id be amazed.Im thinking 19 pitches at Seagrave were on the plans. Pretty sure work on the pitches will be on going throughout the construction and not just at the end. The pitches should be fine. They relaid the King Power pitch at the end of May and that will be pristine come the start of the season. The construction team have even longer than that to sort a number of training pitches (they don’t necessarily need to complete all of them to game ready standard, and will probably prioritise some pitches above others). 3 Link to comment Share on other sites More sharing options...
brucey Posted 3 July 2019 Share Posted 3 July 2019 Pretty sure they sent our ground staff over to redo all the OHL pitches when they took over, and it only took a couple months over summer. Link to comment Share on other sites More sharing options...
Ross 'LCFC' Turner Posted 3 July 2019 Share Posted 3 July 2019 Didn’t we relay our pitch at the KP during the middle of the season after Sven took charge? Link to comment Share on other sites More sharing options...
brucey Posted 3 July 2019 Share Posted 3 July 2019 Link to comment Share on other sites More sharing options...
Popular Post Rusko187 Posted 7 July 2019 Popular Post Share Posted 7 July 2019 They've made a start on the construction, went out on a bike ride and stopped to have a sneaky look but there is security on the gate so this will look crap. 14 5 Link to comment Share on other sites More sharing options...
urban.spaceman Posted 7 July 2019 Share Posted 7 July 2019 (edited) 3 hours ago, Rusko187 said: They've made a start on the construction, went out on a bike ride and stopped to have a sneaky look but there is security on the gate so this will look crap. Excellent work Rusko. From the street view: It looks like a lot of work has been done to lower the ground level (unless that’s just an optical illusion). From what I can remember of the last time I was up there there’s a few cabins to the right of your pic, stacked a bit higher with the LCFC badge on it. The constructed bit *might* be part of the training centre - according to the construction plan they begin creating the indoor pitch on the 11th. Though saying that it might also be part of the Turf Academy or Energy Centre. They might be a bit further south though and I don’t think they were meant to be two storey. Anyway here’s the construction plan: https://pap.charnwood.gov.uk/AnitePublicDocs/01004133.pdf Edited 7 July 2019 by urban.spaceman Link to comment Share on other sites More sharing options...
Rusko187 Posted 7 July 2019 Share Posted 7 July 2019 1 hour ago, urban.spaceman said: Excellent work Rusko. From the street view: It looks like a lot of work has been done to lower the ground level (unless that’s just an optical illusion). From what I can remember of the last time I was up there there’s a few cabins to the right of your pic, stacked a bit higher with the LCFC badge on it. The constructed bit *might* be part of the training centre - according to the construction plan they begin creating the indoor pitch on the 11th. Though saying that it might also be part of the Turf Academy or Energy Centre. They might be a bit further south though and I don’t think they were meant to be two storey. Anyway here’s the construction plan: https://pap.charnwood.gov.uk/AnitePublicDocs/01004133.pdf 2 storey cabins are just out of shot to the right, the other photos have come out badly, and don't really show you anything of note otherwise I'd attach them too. There has been a significant amount of land moved, been at it for months. Link to comment Share on other sites More sharing options...
sylofox Posted 7 July 2019 Share Posted 7 July 2019 On 03/07/2019 at 21:00, dyanmark said: Are we seriously saying that the entire facility at Belvoir Drive was dug up first week of May and now 8/9 weeks later has been relaid and ready for use. Id be amazed.Im thinking 19 pitches at Seagrave were on the plans. Man u have relayed OT in January February on a few occasions. That's a maximum of two weeks and playing on it. Link to comment Share on other sites More sharing options...
dyanmark Posted 8 July 2019 Share Posted 8 July 2019 I probably need educating on this.I know man u did it but the pitch didn't look great at the time.I just wonder why would you dig up and relay if the pitches are in good order and you have all the kit and expertise to keep them in good order Hewitts from Cosby get an awful lot of this work around the country even did the baseball set up at Wet Spam this month. Link to comment Share on other sites More sharing options...
poggypogpog Posted 10 July 2019 Share Posted 10 July 2019 So excited to see all of this come together over the course of the next season. 1 Link to comment Share on other sites More sharing options...
Popular Post Nick Posted 22 July 2019 Popular Post Share Posted 22 July 2019 Every first team squad member is getting their own 7* Suite within the complex with unrivalled facilities to use whenever they like with their families too. The facilities will be truly mind blowing. Players will very much want to come here. 9 Link to comment Share on other sites More sharing options...
urban.spaceman Posted 23 July 2019 Share Posted 23 July 2019 On 22/07/2019 at 09:35, Swan Lesta said: Every first team squad member is getting their own 7* Suite within the complex with unrivalled facilities to use whenever they like with their families too. The facilities will be truly mind blowing. Players will very much want to come here. I remember the plans saying there was going to be a 30 room hotel for players and staff but didn’t really provide any further details. That does sound amazing though. Can’t wait for a look inside the finished article. Link to comment Share on other sites More sharing options...
TheLittleBigMan Posted 23 July 2019 Share Posted 23 July 2019 (edited) On 22/07/2019 at 09:35, Swan Lesta said: Players will very much want to come here. This. Will be a huge statement when it's finished, let alone a stadium expansion to follow. I'm well up for this season, if we smash it on the pitch with all this to follow, we really could cement ourselves as a top 6 club. Proud times. Edited 23 July 2019 by TheLittleBigMan 1 Link to comment Share on other sites More sharing options...
urban.spaceman Posted 24 July 2019 Share Posted 24 July 2019 https://portal.charnwood.gov.uk/Northgate/PlanningExplorerAA/Generic/StdDetails.aspx?PT=Planning Applications On-Line&TYPE=PL/PlanningPK.xml&PARAM0=573853&XSLT=/Northgate/PlanningExplorerAA/SiteFiles/Skins/charnwood/xslt/PL/PLDetails.xslt&FT=Planning Application Details&PUBLIC=Y&XMLSIDE=/Northgate/PlanningExplorerAA/SiteFiles/Skins/charnwood/Menus/PL.xml&DAURI=PLANNING Hundreds of detailed planning documents added - all in no particular order with the KSS reference identifier as the title so you never know what you’re about to see. Still, very interesting and exciting stuff if that’s your kind of thing. Cheers. 2 Link to comment Share on other sites More sharing options...
urban.spaceman Posted 24 July 2019 Share Posted 24 July 2019 titles are: “17793 KSS ..........” Followed by a two letter coding. IP = Indoor Pitch TA = Turf Academy MS = Machinery Store TC = Training Centre PP = Parents Pavilion SP = Show Pitch 1 1 Link to comment Share on other sites More sharing options...
wattolcfc Posted 24 July 2019 Share Posted 24 July 2019 (edited) On 22/07/2019 at 10:35, Swan Lesta said: Every first team squad member is getting their own 7* Suite within the complex with unrivalled facilities to use whenever they like with their families too. The facilities will be truly mind blowing. Players will very much want to come here. I’m so frickin’ excited about our future - we are truly are aiming to be one of the biggest clubs in the country for generations to come! Edited 24 July 2019 by wattolcfc Link to comment Share on other sites More sharing options...
st albans fox Posted 24 July 2019 Share Posted 24 July 2019 On 22/07/2019 at 09:35, Swan Lesta said: Every first team squad member is getting their own 7* Suite within the complex with unrivalled facilities to use whenever they like with their families too. The facilities will be truly mind blowing. Players will very much want to come here. 7* ??? Link to comment Share on other sites More sharing options...
urban.spaceman Posted 24 July 2019 Share Posted 24 July 2019 https://pap.charnwood.gov.uk/AnitePublicDocs/01036211.pdf Hydrotherapy pool confirmed! Link to comment Share on other sites More sharing options...
urban.spaceman Posted 24 July 2019 Share Posted 24 July 2019 On 22/07/2019 at 09:35, Swan Lesta said: Every first team squad member is getting their own 7* Suite within the complex with unrivalled facilities to use whenever they like with their families too. The facilities will be truly mind blowing. Players will very much want to come here. Sneak peak! https://pap.charnwood.gov.uk/AnitePublicDocs/01036200.pdf 1 Link to comment Share on other sites More sharing options...
FoyleFox Posted 24 July 2019 Share Posted 24 July 2019 1 hour ago, urban.spaceman said: titles are: “17793 KSS ..........” Followed by a two letter coding. IP = Indoor Pitch TA = Turf Academy MS = Machinery Store TC = Training Centre PP = Parents Pavilion SP = Show Pitch No code for the newts area? Or Frank? Link to comment Share on other sites More sharing options...
The_77 Posted 2 August 2019 Share Posted 2 August 2019 Just been renamed as the Ed Woodward Training Centre 2 Link to comment Share on other sites More sharing options...
Mehrez Posted 3 August 2019 Share Posted 3 August 2019 4 Link to comment Share on other sites More sharing options...